by cssoftsolutions | Apr 23, 2019
Project Description We have done many ponds of this size with the largest thus far requiring us to move 125,000 CY. This was accomplished using a D9 Dozer and four 631 Scrapers. The mass cut to fill on the project was completed in 17 working days exceeding the...
by cssoftsolutions | Apr 23, 2019
Project Description This project was initially designed to move 100,000 CY. Approximately 2 feet into the cut, we encountered a hard conglomerate rock that required ripping with a D9 and hammering with a 320 excavator with a hoe ram and a 349 excavator with a ripping...
by cssoftsolutions | Apr 23, 2019
Project Description Our team designed and installed a freshwater intake out of the Pecos River near Loving, NM. This project consisted of pump and pipeline ties along with setting float system in the river that was then piped through 20” PVC for 4.5 miles to a 500,000...